Table
S-8
Summary of Mitigation Measures* |
| Issue |
Proposed
Project |
I-80 Least
Cost Design Option |
Alternative I
No Build |
Alternative
II
TSM |
Alternative
III
Base Case |
Alternative
IV
Airport Aerial East of Highway 101 |
Alternative V
Minimum Length Subway to Millbrae |
Design Option
V-A
Minimum Length Subway to Airport GTC |
Design Option
V-B
Minimum Length Subway to San Bruno. |
Alternative
VI
Millbrae Ave. via Airport International Terminal |
| |
| Transit Ridership |
|
|
|
|
|
|
|
|
|
|
| |
| Traffic |
|
|
|
- Consider improved transit service to BART stations.
- Extension of sixth lane on southbound Highway 101.
|
- Same as proposed project.**
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Consider improved transit service to BART stations.
|
| |
|
|
- Local intersection improvements.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Additional parking at Tanforan and Chestnut Stations.
- Residential permit parking program.
- Barriers and security standards at shopping center parking structures.
- Restrictions at BART parking structures.
- Pricing surcharges and other mechanisms at BART extension stations.
|
- Same as proposed project.
|
|
- Additional parking at Daly City and Colma Stations.
|
- Same as proposed project
plus
- Additional parking at Chestnut Station.
|
- Same as proposed project excluding additional parking at Tanforan
Station.
|
|
- Same as Alternative IV including parking meters on commercial streets.
|
- Same as Design Option V-A.
|
- Residential permit parking program.
- Restrictions at BART parking structures.
|
| |
| Land Use |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
- Compliance with state and federal acquisition and relocation laws.
- Implementation of the mitigation measures in Section 3.1, Transportation,
related to traffic and spillover parking control; Section 3.3, Visual Quality, related to
improving visual compatibility of the station parking structures; Section 3.9, Noise,
related to reducing noise and vibration levels to satisfy BART design criteria; and
Chapter Section 4(f) Evaluation, related to minimizing impacts on parklands.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
- Community Cohesion/Social Considerations (Not in Station Vicinity)
|
- Same mitigations recommended for proposed project under Community
Cohesion/Local Economic Activity in Station Vicinity.
|
- Same as proposed project.
|
|
- Noise abatement, landscaping to migrate impacts from right-of-way.
|
- Same as proposed project.
|
- Same as proposed project
plus
- Relocation of pumping station in Millbrae.
|
- Compliance with state and federal acquisition and relocation laws and
regulations.
plus
- Relocation to pumping station in Millbrae.
|
|
|
|
| |
|
|
- Compliance with state and federal acquisition and relocation laws.
|
|
| |
- Regional Economic Activity
|
|
|
|
|
|
|
|
|
|
|
| |
| Visual Quality |
|
|
|
- Design of aerial structure support columns along right-of-way
- Landscaping.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project
plus
- BART station parking structure design.
|
- BART station parking structure design.
- Landscaping.
|
|
|
|
| |
- Scenic Resources and Significant Views
|
- Replacement of mature trees.
- Car storage area buffer.
- Landscaping.
- ALRS Design-Guidelines.
- Soundwall vegetation.
|
- Same as proposed project.
|
|
- Same as proposed project excluding car storage area buffer.
|
- Same as proposed project.
|
|
|
|
|
|
| |
|
|
- Landscaping.
- Light and glare screening.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
|
| |
|
|
|
|
|
|
- Preservation and enhancement of streetscapes and station entryways.
- Landscaping.
|
|
|
|
|
- Same as proposed project.
|
| |
| Cultural Resources |
|
- Direct Physical Disturbance
|
- Memorandum of Agreement to specify the terms, conditions, and
restrictions of the mitigation actions.
- Archaeological testing and compliance with applicable procedures and
regulations.
- Adherence to design criteria for dewatering-related settlement of
adjacent structures.
- Ongoing monitoring of impacts.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Diminution of Historic Setting
|
- Landscaping
- Reduction of groundborne vibration.
|
- Same as proposed project.
|
|
|
- Same as proposed project
plus
- Sound walls to reduce noise levels at cemeteries and a Memorandum of
Agreement for American Legion Post.
|
- Same as proposed project.
|
- Same as proposed project
plus
- Memorandum of Agreement for downtown San Bruno properties and American
Legion Post.
|
|
|
- Same as proposed project.
|
| |
| Community Services |
- Local police fire service improvements.
|
- Same as proposed project.
|
- Local jurisdictions would be responsible for improvements.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
|
|
| Geology, Soils, and
Seismicity |
- Adherence to BART design criteria i.e.:
- Design structures and facilities for seismic impacts.
- Design of deep foundations.
- Development and implementation of tunnel design standards.
|
- Same as proposed project.
|
|
- Seismic and settlement design criteria.
- Design of deep foundations.
|
- Same as proposed project excluding tunnel design.
|
- Same as proposed project including development of seismic design data for
SFIA.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
|
|
|
| Biological Resources |
- Creation of creekside habitats and/or wetlands of equal wildlife habitat
values.
- Avoidance of wetlands during construction and filling.
- Project modification to protect SFGS travel routes and habitat.
- Management and enhancement of existing aquatic habitats.
- Habitation Restoration Plan for SFGS.
- Relocation of drainage channels and other waterways.
- Oil and water separators in storm water catch basins.
|
- Same as proposed project.
|
- Management and enhancement of SFGS habitats.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| Hydrology and Water
Quality |
|
|
|
- Elevation of facilities.
- Minimal use of landfill.
- Drainage system improvements.
- Onsite stormwater storage.
- Stormwater infiltration.
|
- Same as proposed project
plus
- the construction of a ditch or culvert.
|
- The City of South San Francisco would have to make flood and drainage
control improvements.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Installation of stream bank protection.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Oil and water separators in catch basins.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Well replacement.
- Use of grout sealant.
- Containment of water during construction.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| Noise |
- Groundborne Noise and Vibration
|
- Floating slab trackbed.
- Resiliently supported ties or soft rail fasteners.
- Relocation of impacted homes.
- Off-site mitigation.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Building enclosure and design.
- Shielding of the wheel truing machine.
- Sound barriers at access/egress doors.
- Construction of sound wall(s).
- Redesign of the turntable.
- Concrete barrier.
- Sound absorptive material for sound wall(s).
|
- Same as the proposed project
plus
- A closed deck.
|
|
- Same as proposed project.
|
- Same as I-380 Least-Cost Design Option.
|
- Same as I-380 Least-Cost Design Option
plus
- off-site migration.
|
|
- Same as Alternative IV excluding a concrete barrier.
|
|
- Same as proposed project.
|
| |
| Air Quality |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
| Public Health and Safety |
|
| |
- Exposure to Hazardous Materials
|
|
|
|
|
|
|
|
|
|
|
| |
- Exposure to Electromagnetic Fields (EMF)
|
|
|
|
|
|
|
|
|
|
|
| |
| Energy |
|
|
|
|
|
|
|
|
|
|
| |
| Construction |
|
|
|
- Coordination with local jurisdictions regarding roadway improvements,
street closures, vehicle, cyclist, and pedestrian access, traffic control near elementary
schools, track re-alignments, construction vehicle routes, and construction schedules.
- Coordination with SamTrans, CalTrans, and CalTrain to minimize service
impacts.
- Coordination with local utilities to achieve utility line relocation.
- Passenger notification of delays.
- Possible traffic and pedestrian detour during construction.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Coordination with transit agencies to minimize impacts to commuter
services.
- Coordination with cities, communities, schools, and cemeteries to
minimize impacts.
- Replacement parking for Holy Cross Cemetery.
- Maintenance of access to businesses.
- Restoration or replacement of displaced parks and recreation.
|
- Same as proposed project.
|
|
|
- Same as proposed project.
|
- Same as proposed project
plus
- Coordination with SFIA.
|
- Same as proposed project.
|
- Same as proposed project
plus
- Coordination with SFIA.
|
- Same as proposed project.
|
- Same as proposed project
plus
- Coordination with SFIA.
|
| |
|
|
- Cemetery landscaping and alternate cemetery access.
- Alternate laydown/mobilization sites.
- Laydown area visual barrier.
|
- Same as proposed project.
|
|
- No feasible mitigation measures.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Landscaping/Re-vegetation.
- Compliance with noise limits.
- Implementation of dust control practices.
- Avoidance of historic structures.
- Compliance with the Section 106 process and an MOA as required.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Early coordination of construction plans with local jurisdictions.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Coordination with utility agencies or companies to schedule service
disruption; provide temporary backup service.
- Customer notification.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
- Geology, Soils, and Seismicity
|
- Dewatering and groundwater control of excavation and tunneling.
- Implementation of a monitoring program.
- Design for tunneling-induced settlement.
- Proper selection of tunneling method.
|
- Same as proposed project.
|
|
|
- Dewatering and groundwater control of excavation and tunneling.
- Implementation of a monitoring program.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
|
- Same as proposed project.
|
| |
|
|
- Alterations to the project right-of-way and laydown areas to avoid or
reduce wetland disturbance.
- Restoration and recreation of disturbed wetlands.
- Use of sediment and silt controls.
- Use of slurry or sheet pile shoring walls.
- Use of watering truck.
- Implementation of erosion control measures.
- Management and enhancement of existing aquatic habitats.
- Habitat Restoration Plan for SFGS.
- Construction scheduling.
- Avoidance of wetlands and sensitive biotic resources.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
- Hydrology and Water Quality
|
- Adherence to NPDES construction permit conditions.
- Use of sedimentation ponds or tanks.
- Dry season construction.
- Maintenance of unobstructed drainageways.
|
- Same as proposed project.
|
|
- Same as proposed project excluding sedimentation ponds
plus
- Erosion control plan.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Adherence to noise and vibration limits.
- Use of noise control measures within and outside of construction limits.
- Use of proper construction equipment.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Improve traffic flow through construction parking configuration, traffic
control and management, and scheduling.
- Equipment engine maintenance and best construction practices.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
- Hazardous Materials Contingency Plan.
- Site sampling and remediation.
|
- Same as proposed project.
|
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
- Same as proposed project.
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
| Source: Ogden |